OVERHEAD TRAVELLING CRANE | MECHANICAL AND PLANT ENGINEERING

BELLMER GmbH

Gloning Krantechnik Gmbh equipped the entire new building “Plant 3” of Gebr. Bellmer GmbH Maschinenfabrik in Niefern-Öschelbronn with new crane systems.

 

The entire building project was preceded by a planning period of many years, during which time we were always available to advise and assist both the client and the planners. As a result, all potential for optimisation in the areas of structural planning and utilisation of the existing space could already be included in the planning of the new factory halls.

 

The scope of supply comprised the crane systems in the S.W.L. range of 3.2 – 80 tonnes, including the crane runways and the power supply lines. In addition to the surface crane system for the entire hall, bracket overhead crane systems with a load capacity of 5t were also used for this construction project to cover individual workstations.